Short Lead Time for Switch Cabinet Box - Outdoor double side front service waterproof cabinet – Ruichen
Short Lead Time for Switch Cabinet Box - Outdoor double side front service waterproof cabinet – Ruichen Detail:
Product information
Place of Origin | Shenzhen,Guangdong, China |
Model size | According to customer’s requirements |
Brand Name | RUICHEN |
Tube Chip Color | Full color |
Display Function | Video |
Usage | outdoor |
Pixels | P10mm/P 5mm/P 6.67mm/P8mm |
Screen Dimension | Custom Made |
Module size | 320*160 mm,192*192mm,256*128mm |
Color | black, blue, gray,white |
Certificate | ISO9001,CE |
Application | Advertising |
Name |
LED display waterproof cabinet |
|||||||
Material |
Iron |
Aluminium |
||||||
Cabinet size |
>0.6㎡ |
<0.6㎡ |
>0.6㎡ |
<0.6㎡ |
||||
Plate thickness |
1.0mm |
1.2mm |
1.0mm |
1.2mm |
1.5mm |
1.8mm |
1.5mm |
1.8mm |
Standard accessory |
Power supply plate,received card plate,position pin,connector plate |
Specification
Easy installation front access P6 front maintenance outdoor led display for Christmas Decoration | |
Type | SMD3535 |
Composition | 1R1G1B |
Scan method | 8S |
Resolution | 32 x 32dots (W x H) |
Pixel pitch | 6mm |
Module size | 192*192 mm |
Module quantity | 4×4 |
Resolution | 128x 128(W x H) |
Cabinet size | 768*768mm |
Panel Type and Material | Iron or aluminum |
Best viewing distance | 6-80m |
Maximum power | <1200W /m2 |
Viewing angle | 160°/140° |
Brightness | 6500cd/m2 |
Pixel density | 27777dot/m2 |
Control system | Synchronous System |
Lifespan | 100,000 hours |
Frame frequency | 60Hz |
Installation | Hanging/Fixed with support bracket |
Certification | CE, ROSH,FCC |
Packaging & Delivery
There are mainly three types of packing way:
Delivery way:
1. By sea:Maritime transportation is a way of transporting goods between ports in different countries and regions by sea lanes, and it is the most important mode of transportation in international trade.
2. By air:Air transport has won a considerable market with its fast, safe, punctual and super-high efficiency, greatly shortening the delivery time, and greatly promoting the logistics supply chain to speed up the capital turnover and circulation.
3.By express: TNT/UPS/DHL/FEDEX,It is more convenient and quick,It is mainly used for transporting goods with small volume and light weight.
Shipping port:shenzhen /guangzhou/tianjin port.
Shipping term:EXW term、FOB term、CIF term
Payment types: T/T transfer,Weston union
Product detail pictures:




Related Product Guide:
Our firm sticks to the basic principle of "Quality is the life of your company, and status will be the soul of it" for Short Lead Time for Switch Cabinet Box - Outdoor double side front service waterproof cabinet – Ruichen , The product will supply to all over the world, such as: Sudan, Johor, Puerto Rico, To let customers be more confident in us and get the most comfortable service, we run our company with honesty, sincerity and best quality . We firmly believe that it is our pleasure to help customers to run their business more successfully, and that our professional advice and service can lead to more suitable choice for the customers.

This company has a lot of ready-made options to choose and also could custom new program according to our demand, which is very nice to meet our needs.
